Manufacture of a waste heat boiler for converter gases VOKG5 for PJSC ArcelorMittal Kryvyi Rih
After the renewal of the contract, the first element of the boiler, Segment No. 1 for the converter gas waste heat boiler, was manufactured and shipped to PJSC ArcellorMittal Kryvyi Rih. The work is carried out according to the established schedule.