The construction of the first start-up complex has begun. This includes the construction of the main building with a smoke exhauster and pumping rooms for 4 hot water boilers of the type KV-G-116.3-150 with a capacity of 100 Gcal/hour each.
The purpose of this project is:
- Provision of “Osokorki” residential neighborhood with thermal energy in the amount of 465 MW (400 Gcal).
- Improving the heat supply reliability in the Kharkivsky residential area in the city of Kiev.
- Improving the efficient use of fuel and energy resources through the use of modern equipment.
- Ensuring compliance with modern environmental standards.
- Construction of the first stage involves the installation of 4 water boilers of the type KV-G-116.3-150 with a capacity of 100 Gcal/hour and equipped with a modern Honeywell process control system.