Pipelines supply for routine maintenance of Tripolskaya TPP
On December 7, 2020, in accordance with the approved delivery schedule, supply pipelines were manufactured and shipped. The equipment is intended for routene repairs of power units 2 and 3 of the Tripolskaya TPP Centrenergo.
Working parameters:
Rw. = 18.4 MPa;
Tw. = 215 ° C for st. 15GS;
Rw. = 25.01 MPa;
Tw. = 545 ° C for st. 15Х1М1ф.
All elements are manufactured with a working life of 200,000 hours between failures.