Production of pipelines for maintenance of Tripol TPP
ZEM-ENERGOBUD TM has signed an agreement and began the production of elements of high pressure pipelines, feed water, emergency injection and hot superheating for Tripol TPP Centrenergo .
Pipelines will be used for the repair needs of blocks No. 2 and 3.
Equipment Performance:
- pressure up to 25.01 MPa;
- temperature 545 C;
- resource for failure 200,000 hours.
Delivery is scheduled for the second quarter of 2020.