Manufacture of a waste heat boiler for converter gases VOKG5 for PJSC ArcelorMittal Kryvyi Rih

After the renewal of the contract, the first element of the boiler, Segment No. 1 for the converter gas waste heat boiler, was manufactured and shipped to PJSC ArcellorMittal Kryvyi Rih. The work is carried out according to the established schedule.

Latest news

Modernization of the centralized heating system in Lozova city

Restoration of the thermal infrastructure of Lozovaya city

Update on the project to build a new pressure collector in the village of Borodyanka