The elements of the high-pressure feed water pipeline have been shipped for the unit # 7 routine repair of the Slavyanskaya TPP on December 30, 2020 in accordance with the approved delivery schedule for the needs of Donbasenergo.
Working parameters:
Рw. = 38 MPa (380 kgf/cm2) и tw. = 280˚С.
Estimated service life is 200,000 hours.