Construction of 110 kV overhead power transmission line “TPP-5 – Arkada”

Project status:
In progress
Deadline:
started in 2017
Customer:
Limited Liability Company “Arkada-Budivnytstvo”

ZEM-ENERGOBUDᵀᴹ PERFORMS WORK AS A MAIN CONTRACTOR.

LIST OF WORK PERFORMED:
  • Construction of a 110 kV overhead power transmission line “TPP-5 – Arkada” with the transition over the river Dnieper, including:
  • Dismantling of existing foundations, supports and wires of the existing 2-circuit 110 kV overhead power transmission line “TPP-5 – Lugovaya – Kharkovskaya”;
  • Execution of cast reinforced concrete foundations and installation of 18 multisided steel pole supports;
  • Complete reconstruction of 2 transitional supports across the river Dnieper H = 101 m;
  • Installation of a new 4- circuit 110 kV overhead power transmission line “TPP-5 – Arkada”;
  • Installation of fiber-optic link on supports;
  • Supply of all equipment and materials;
  • Execution of start-up and adjustment work; object commissioning.