Electric power supply and installation of inert materials silo at the production center in the village Vishniovoye

Project status:
Completed
Deadline:
july 2006.
Customer:
JSC "Ukrtsukorteploizolyatsiya"

ZEM-ENERGOBUDᵀᴹ PERFORMED THE WORK IN THE CAPACITY OF A GENERAL CONTRACTOR.

LIST OF WORK PERFORMED:
  • Manufacturing and installation of metal structures for the inert materials silo tower with H = 50m;
  • Execution of the project stage P (design work) and the stage R (working draft);
  • Supply of all equipment;
  • Reconstruction of the 10 kV “Kiev-Volynsky – Boyarka” PL-10;
  • Reconstruction of TP-1 transformer substation in the village Vishniovoye with the replacement of all oil switches by vacuum circuit breakers;
  • Installation of the Automatic system for commercial accounting of power consumption (ASCAPC) with integration into the ASCAPC system of the South-Western Railway and telemechanics and communication systems on all TP-1 lines of the village Vishniovoye and 10 kV outdoor cellular type switch gear KRUN-10 in the village Boyarka;
  • Turnkey construction of the new indoor transformer substation with a capacity of 2×1600 kVA;
  • Laying of 10 kV and 0.4 kV cable lines;
  • Start-up and adjustment work for all equipment;
  • Object commissioning.