Electric power supply of the printing works with reconstruction of 110/6 kV “GPP” (main step-down substation) in the town of Ukrainka

Project status:
Completed
Deadline:
2007 - august 2008
Customer:
"Ukrpoligrafmedia"

ZEM-ENERGOBUDᵀᴹ PERFORMED THE WORK IN THE CAPACITY OF A CONTRACTOR.

LIST OF WORK PERFORMED:
  • Obtaining specifications for power supply of the facility and execution of a set of design and estimate documentation for the stage P (design work) and stage R (working draft);
  • Construction of the indoor transformer substation TP 2×1200/0.4;
  • Supply and installation of 1200 kVA power transformers, and equipment for 6 kV and 0.4 kV “GPP” (main step-down substation);
  • Reconstruction of the existing and installation of additional 6 kV cells at 110/6 kV “GPP” substation (main step-down substation);
  • Laying of 6 kV cable line for power supply of the indoor transformer substation TP 2×1200/6/0.4;
  • Laying of 0.4 kV cable line for power supply and connection of technological equipment of the printing work;
  • Full scope of the start-up and adjustment work;
  • Object commissioning.