LIST OF WORK PERFORMED:
- Obtaining specifications for power supply of the facility and execution of a set of design and estimate documentation for the stage P (design work) and stage R (working draft);
- Construction of the indoor transformer substation TP 2×1200/0.4;
- Supply and installation of 1200 kVA power transformers, and equipment for 6 kV and 0.4 kV “GPP” (main step-down substation);
- Reconstruction of the existing and installation of additional 6 kV cells at 110/6 kV “GPP” substation (main step-down substation);
- Laying of 6 kV cable line for power supply of the indoor transformer substation TP 2×1200/6/0.4;
- Laying of 0.4 kV cable line for power supply and connection of technological equipment of the printing work;
- Full scope of the start-up and adjustment work;
- Object commissioning.