Electric power supply of the residential complex “Aviator”

Project status:
Completed
Deadline:
january 2007 - february 2008
Customer:
Limited Liability Company “T.M.M.” LTD

ZEM-ENERGOBUDᵀᴹ PERFORMED THE WORK IN THE CAPACITY OF A GENERAL CONTRACTOR.

LIST OF WORK PERFORMED:
  • Implementation of the project stage P (design work) and stage R (working draft);
  • Installation of the 10/0.4 kV package transformer substation; laying of 10 kV and 0.4 kV cable lines for the needs of construction;
  • Supply and installation of equipment for transformer substations TP 2×1000 10/0.4 kV;
  • Reconstruction of cells in RP 64 switchgear and in Otradnaya substation with replacement of 10 kV oil switches with vacuum switches and relay protection and automation systems;
  • Laying of 10 kV cable lines for power supply of RP 64 switchgear and 2×1000 10/0.4 kV transformer substations, laying of 0.4 kV cable lines for power supply of the residential complex and in-house networks;
  • Full scope of start-up and adjustment work.