ZEM-ENERGOBUDᵀᴹ PERFORMED THE WORK IN THE CAPACITY OF A GENERAL CONTRACTOR.
LIST OF WORK PERFORMED:
- Implementation of the project stage P (design work) and stage R (working draft);
- Installation of the 10/0.4 kV package transformer substation; laying of 10 kV and 0.4 kV cable lines for the needs of construction;
- Supply and installation of equipment for transformer substations TP 2×1000 10/0.4 kV;
- Reconstruction of cells in RP 64 switchgear and in Otradnaya substation with replacement of 10 kV oil switches with vacuum switches and relay protection and automation systems;
- Laying of 10 kV cable lines for power supply of RP 64 switchgear and 2×1000 10/0.4 kV transformer substations, laying of 0.4 kV cable lines for power supply of the residential complex and in-house networks;
- Full scope of start-up and adjustment work.