Electric power supply of the “Slavutich” PBC plant

Project status:
Done
Period of execution:
2010
Client:
OJSC PBK “Slavutych”

ZEM-Energobudᵀᴹ performed the work in the capacity of a general contractor.

List of work performed:
  • Obtaining technical specifications for the electric power supply of the facility and the execution of a set of design and estimate documentation.