External power supply of “SK Johnson” production facilities

Project status:
Completed
Deadline:
2009
Customer:
“SK Johnson”

ZEM-ENERGOBUDᵀᴹ PERFORMED THE WORK IN THE CAPACITY OF A GENERAL CONTRACTOR.

LIST OF WORK PERFORMED:
  • Development и receipt of the technical specification for electric power supply;
  • Development and coordination of a set of design and estimate documentation for the stage P (design work) and the stage R (working draft).