ZEM-ENERGOBUDᵀᴹ PERFORMED THE WORK AS A GENERAL CONTRACTOR IN THE CONDITIONS OF NEW CONSTRUCTION.
LIST OF WORK PERFORMED:
- Execution of the construction part of the substation near the mine named after Frunze in full, incl. reinforced concrete fence around the perimeter;
- Supply and installation of 35/6/6 kV 16 MVA transformer, 35 kV switching equipment for VRU-35 kV, and KRPZ-6 kV:
- Installation of the ground loop and lightning protection circuit with masts of H = 16 m;
- Start-up and adjustment work.