ZEM-ENERGOBUDᵀᴹ PERFORMED THE WORK IN THE CAPACITY OF A GENERAL CONTRACTOR.
LIST OF WORK PERFORMED:
- Designing of a two-transformer 35/6 kV substation with a capacity of 2×6.3 MVA and re-equipment of the double-circuit PL-35 kV for the project stage P (design works) and the project stage P (working draft).