Reconstruction of the district boiler house “Moskovskaya-1”
Project status:
Completed
Customer:
AEK “Kyivenergo”
ZEM-ENERGOBUDᵀᴹ PERFORMED THE WORK AS A CONTRACTOR UNDER THE CONDITIONS OF THE EXISTING BOILER HOUSE.
LIST OF WORK PERFORMED:
- Design work;
- Dismantling of existing obsolete equipment, including 2 boilers;
- Supply and installation of 3 boilers ICI CALDAI made in Italy with a capacity of 17 MW each and their complete piping and valving;
- Supply and installation of electrical, pumping, and ventilation equipment, gas supply systems, instrumentation and automation, relay panels;
- Installation of chimney H = 34 m;
- Start-up and adjustment works for all technological and electrical equipment;
- Object commissioning.