Reconstruction of the HPP “Bilche-Zolotoe”

Project status:
Done
Period of execution:
2012
Client:
“Aquanova Investment” LLC

ZEM-Energobudᵀᴹ performed the work as a general contractor.

List of work performed:
  • Inspection of reinforced concrete and metal structures of the dam;
  • Development of the project on a dam recovery / reconstruction based on survey results;
  • Recovery of reinforced concrete structures of the dam;
  • Fabrication and installation of metal gateway doors;
  • Complete corrosion protection.