Reconstruction of the district boiler house "Moskovskaya-1"

Project status:
Done
Period of execution:
2012 - 2014
Client:
AEK “Kyivenergo”

ZEM-Energobudᵀᴹ performed the work as a contractor under the conditions of the existing boiler house.

List of work performed:
  • Design work;
  • Dismantling of existing obsolete equipment, including 2 boilers;
  • Supply and installation of 3 boilers ICI CALDAI made in Italy with a capacity of 17 MW each and their complete piping and valving;
  • Supply and installation of electrical, pumping, and ventilation equipment, gas supply systems, instrumentation and automation, relay panels;
  • Installation of chimney H = 34 m;
  • Start-up and adjustment works for all technological and electrical equipment;
  • Object commissioning.