MANUFACTURER: TMM-ENERGOBUDᵀᴹ
SUPPLY DESCRIPTION:
Steam pipelines for the plant collector section of the turbine, a steam pipeline of the high-pressure cylinder of the turbine were manufactured and supplied. Steam pipeline of the boiler. Superheated steam pipeline to the fast-response PRDS. Live steam pipelines for use at TPP-8, TPP-9, TPP-26, TPP-20, TPP-21 of the “Mosenergo” PJSC territorial generating company TGK-3 were produced and delievered.
The operating parameters of the high-pressure pipelines are P=13.73 MPa, T=560°C.
The total weight of the supply amounted to 346.63 tons.
‘Mosenergo” is a territorial generating company, which includes 15 power plants with an installed electrical capacity of 12.8 thousand MW and an installed heat capacity of 43.1 thousand Gcal/h.
PJSC “Mosenergo” is the largest producer of thermal energy in the world. (The data according to Wikipedia).