MANUFACTURER: TMM-ENERGOBUDᵀᴹ
SUPPLY DESCRIPTION:
488.13 tons of turbine pipelines for Unit 1 of the Novo-Voronezh NPP were manufactured and supplied.
The scope of supply of turbine pipelines consisted of 25 pipe systems that ensure reliable operation of the turbine.
The supplied pipelines belong to the 3rd and 4th safety class.