According to the schedule of the ACCs of the Central region and the Central EU in the period from 1.03.2019 to 26.03.2019. ZEM-Energobudᵀᴹ realizes the third stage of works on the reconstruction of 110 kV Substation “CHP 5-Kharkiv-Lugova”.
At this stage, the dismantling of obsolete grid supports 110 kV No. 47, No. 48 and No. 50 is being carried out.
Support number 47 is replaced by a modern multi-faceted support for a new four-axle line of 110 kV.
Replacing the old thunderstorm protection cable and conducting the AC185 on new wires with an increase in the intersection of the AC240 and the AS400.