Construction of the residential complex “Sonyachna Brama”

Project status:
Completed
Deadline:
2010 - 2017
Customer:
Limited Liability Company “TMM”

ZEM-ENERGOBUDᵀᴹ WORKED AS A CONTRACTOR PERFORMING WORK IN 4 STAGES OF CONSTRUCTION.

LIST OF WORK PERFORMED:
  • Equipment supply and installation of 10 kV distribution substation (4x1000kVA) and 4 10 / 0.4 kV transformer substations (2x1000kVA), including 10 / 0.4 kV dry-type transformers, a set of 10 kV XIRIA cells and 0.4 kV high-voltage cells;
  • Laying of 10 kV and 0.4 kV cable lines;
  • Installation of outdoor lighting networks;
  • Installation of interior electrical networks and electric lighting in homes and in office and domestic premises;
  • Installation of the automatic system for commercial accounting of power consumption (ASCAPC) with its integration into the ASCAPC of “Kyivenergo”;
  • Supply of equipment and installation of fire suppression systems in underground parking;
  • Start-up and adjustment work of all mounted equipment.