ZEM-ENERGOBUDᵀᴹ PERFORMED THE WORK AS A CONTRACTOR UNDER THE CONDITIONS OF THE EXISTING 35 KV SUBSTATION.
LIST OF WORK PERFORMED:
- Dismantling of existing equipment and its foundations;
- Foundation works for 35 kV and 10 kV equipment, installation of reinforced concrete fencing of substations, and internal substation roads;
- Installation of two 35/10 kV 4000 kVA transformers, KRUN-35 kV and KRUN-10 kV outdoor cellular type switch gears, 10 kV and 0.4 kV cable lines;
- Installation of 35 kV external power supply cable line with output to the anchor support and arrangement of an open-type adapter unit on the support of 35 kV overhead power transmission line.