MANUFACTURER: TMM-ENERGOBUDᵀᴹ
SUPPLY DESCRIPTION:
1,117.18 tons of turbine pipelines for Unit 1 and 1105.05 tons for Unit 2 of the Leningrad NPP-2 with a VVER-1200 reactor were manufactured and supplied.
The scope of supply of turbine pipelines consisted of 74 pipe systems that ensure reliable operation of the turbine. The supplied DN 800 pipelines belong to the 3rd and 4th safety class.