Projects

Completed: 2009
Overhaul of boilers at the “Energiya” plant
Completed: 2008
Designing of Izmail TPP consisting of a production package with 268 MW gas turbine generators
Completed: 2009
Electric power supply of the trade center “Mir Torgovli” with laying of 10 kV cable line
Completed: 2009
Reconstruction and technical re-equipment of 150/35/6 kV substation “Leski”
Completed: 2009
Reconstruction and technical re-equipment of 150/35/6 kV substation “Temvod”
Completed: march –december 2008
Upgrading of 35/6 kV substation “RRZ” at the plant “Vulkan”
Completed: december 2007 - may 2008.
Electric power supply of the hotel and office complex in the big village Schastlivoye
Completed: january 2007 - february 2008
Electric power supply of the residential complex “Aviator”
Completed: october 2007 - february 2008
Construction of 10 and 0.4 kV electrical networks in the residential neighbourhood “Shirma”
Completed: 2007 - august 2008
Electric power supply of the printing works with reconstruction of 110/6 kV “GPP” (main step-down substation) in the town of Ukrainka
Completed: august - december 2007
Re-laying of 6 kV cable line and construction of cable duct system from 110/6 kV substation “Lugovaya”
Completed: april - august 2007
Re-laying the cable networks at the Dnieper pump water intake
Completed: may - august 2007
Laying the 10 kV RP155-3604 cable line along the Goloseevskaya street
Completed: 2006 - july 2007
Reconstruction and technical re-equipment of ST-1 with equipment supply
Completed: august 2006 - february 2007
Construction of 10/0.4 kV 6 MW underneath transformer substation in the shopping and leisure center “Komod”
Completed
Construction of 110 kV overhead power transmission line “TPP-5 – Arkada”